|
Religious Project |
Convent Extension & Refurbishment, Carrigtwohill, Co. Cork |
Client: |
Poor Servants of the Mother of God |
Address: |
St. Aloysius Convent, Main Street, Carrigtwohill, Co. Cork. |
Date: |
August 2008 - November 2009. |
Description: |
The project involved the complete refurbishment of the existing St. Aloysius Convent in Carrigtwohill, along with an extension to the southern side to incorporate a new conservatory. The existing 18 bedroom facility was converted into 12 bedrooms with en-suite facilites. In addition, the building's energy rating was improved considerably with solar panels, pumped cavity insulation and drylining used throughout the building. | | |
|

Prior to refurbishment & extension works. |
|

Following refurbishment & extension works.

|
| |
| | |
| |
|
|
RIAI Registered Practice No. 10010. |
|
|
|