We worked with the Dalata Hotel group to achieve planning permission for the extension of an existing vacant hotel building which was a shell core build that had been left vacant for a number of years. The design was to expand an extra floor on top and convert the car parking in the 2no. basement levels into a business centre.
This resulted in a 5 storey over 2 basement storey design. An all new atrium entrance fronting onto south mall with café space to enliven the street interaction. This project has since been built by the Delta Group bringing a much needed city centre hotel to improve Cork’s tourism industry.